Sandy’s Beach Dock Completed

P1010864

Sandy’s dock was completed at the last work party. Special thanks to my nephews, Matt and Scott Groce, who worked off their tails to help me “Get her Done”

The dock was the last piece of the boardwalk, a two year project to connect the waterfront to our building site. A resting cradle for “Spitfire” an Acorn 15 row/sailboat was also added to the beachfront. The boardwalk is over 150 meters long and used over 1200 feet of two by ten’s, lots of blood, sweat and tears, so we are super stoked to complete it.

P1010841

P1010843 P1010848

Leave a comment